• Index page
  • Información de interés
  • Login
  • Communities & Collections
  • Language
    Englishespañolportuguês (Brasil)
View Item 
  •   Redicuc Home
  • Tesis Doctorales y Trabajos de Grado
  • Pregrado
  • View Item
  •   Redicuc Home
  • Tesis Doctorales y Trabajos de Grado
  • Pregrado
  • View Item
Universidad de la Costa, CUC. Calle 58 # 55 - 66. Barranquilla, Colombia. 336 22 00. repositorioredicuc@cuc.edu.co. Corporación Universidad de la Costa.

Identificación de las variables influyentes sobre el rendimiento en la obra civil

Thumbnail
View/Open
Trabajo de grado (2.894Mb)
Date
2017-06-12
Author
Lasso O., Alisahamir Sharif Arafat
Metadata
Show full item record
BASE GoogleScholar
Compartir:


Impacto

URI: http://hdl.handle.net/11323/255

Abstract

Actualmente Colombia se encuentra en una etapa de desarrollo e inclusión de nuevos mercados que a través de los tratados de libre comercios se ha generado una economía globalizada donde a pesar de que en el país prima la industria nacional es importante la competitividad en temas de educación superior, económico, infraestructura, cultural, turístico, entre otros factores que pueden aportar de una u otra manera a el desarrollo. La ingeniería civil es una de las ramas de la ingeniería basadas en el estudio, análisis, desarrollo, ejecución y control de obras civiles (vías, edificios, obras hidráulicas, entre otras obras de infraestructura) que van en pro del crecimiento de la región y del país. Si bien es cierto que actual mente se encuentran en desarrollo muchos proyectos civiles, es importante destacar que también existen muchos proyectos que se encuentran suspendidos o retrasados; estas suspensiones o retrasos son el producto de una serie de variables que afectan para este casi en particular de forma negativa en la ejecución de los proyectos civiles. El objetivo general del proyecto es: Identificación de las variables influyentes sobre el rendimiento en la obra civil. Objetivos específicos: Realizar una investigación de los rendimientos en las diferentes actividades que se realizan en una obra civil. , Aplicar las herramientas de recolección de información a los stakeholders implicados, Clasificar las variables que afectan el rendimiento en la obra civil, Analizar el comportamiento de las variables que perjudican el comportamiento del avance de un proyecto. El desarrollo del proyecto cumplió con cada uno de los objetivos específicos identificando las variables de mayor incidencia en el rendimiento en la obra civil. Las herramientas utilizadas para el desarrollo de este proyecto fueron las entrevistas desarrolladas a los directores de obra, al igual que la compañía y seguimiento del tutor, con el fin de generar la producción de una información certera.
 
At the moment Colombia is in a stage of development and inclusion of new markets that through the treaties of free trade has generated a globalized economy where in spite of that in the country the national industry is important the competitiveness in subjects of superior education , Economic, infrastructure, cultural, tourism, among other factors that can contribute in one way or another to development. Civil engineering is one of the branches of engineering based on the study, analysis, development, execution and control of civil works (roads, buildings, hydraulic works, among other infrastructure works) that are in favor of the growth of the region and from the country. While it is true that many civil projects are currently under development, it is important to note that there are also many projects that are suspended or delayed; These suspensions or delays are the product of a series of variables that affect this almost in a negative way in the execution of civil projects. The general objective of the project is: Identification of influential variables on performance in civil works. Specific objectives: To carry out an investigation of the yields in the different activities that are realized in a civil work. , Apply the tools of information collection to the stakeholders involved, Classify the variables that affect the performance in the civil work, Analyze the behavior of the variables that impair the behavior of the progress of a project. The development of the project met each of the specific objectives identifying the variables with the greatest impact on performance in civil works. The tools used for the development of this project were the interviews developed to the directors of work, as well as the company and monitoring of the tutor, in order to generate the production of accurate information.
 
Collections
  • Pregrado

Browse

All of RedicucCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Compartir en

Universidad de la Costa, CUC

  • Calle 58 # 55 - 66. Barranquilla, Colombia

  • 336 22 00

  • repositorioredicuc@cuc.edu.co

Corporación Universidad de la Costa CUC, Personería Jurídica con Resolución No. 352 del 23 de abril de 1971 y reconocida como Universidad mediante resolución 3235 del 28 de marzo de 2012 expedida por el MEN. Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional.

Enlaces institucionales:

  • Universidad de la Costa
  • Biblioteca
  • Catálogo bibliográfico
  • Recuperador Primo

Universidad de la Costa CUC.
Politica de Protección de Datos.