dc.creatorEscorcia González, John
dc.creatorMartínez Collante, Erika
dc.date.accessioned2019-02-21T16:40:08Z
dc.date.available2019-02-21T16:40:08Z
dc.date.issued2011-10-31
dc.identifier.citationEscorcia González, J., & Martínez Collante, E. (2011). Análisis de la capacidad del proceso de cargue y descargue en la sociedad portuaria regional Barranquilla SPRB. INGE CUC, 7(1), 17-26. Recuperado a partir de https://revistascientificas.cuc.edu.co/ingecuc/article/view/274es_ES
dc.identifier.issn2382-4700
dc.identifier.issn0122-6517
dc.identifier.urihttp://hdl.handle.net/11323/2671
dc.description.abstractSe analizó el proceso de cargue y descargue de contenedores en SPRB, se realizó una simulación con el software Arena®; con datos históricos y toma de tiempos se construyó el diagrama y se identificaron las partes del sistema, como: las entidades (camiones), los recursos (Straddle Carrier - SC), las estaciones (entrada, báscula, patio de contenedores y salida), las distancias recorridas por los camiones, además de las distribuciones estadísticas de las demoras en cada uno de los procesos halladas por medio del Input Analyzer del software Arena®, se analizaron en cuatro diferentes escenarios en los que se modificó la cantidad de SC que realizaban la tarea del cargue y descargue, probamos con dos, tres, cuatro y cinco; los resultados indicaron que con dos SC colapsa el sistema, con tres se presentan demoras inaceptables y con cinco se produce una reducción en los tiempos de atención cercana al 75%. Convirtiéndose en el escenario recomendado.es_ES
dc.description.abstractWe analyzed the process of loading and unloading of containers SPRB, we conducted a simulation software Arena®, historical data and making time diagram was constructed and identified the parts of the system as entities (trucks) resources (Straddle Carrier - SC), Stations (input, Scales, Container Yard and Exit), the distances traveled by trucks, in addition to the statistic Input Analyzer Arena® were analyzed at four different scenarios in which modified the amount of SC performed the task of loading and unloading, we tested two, three, four and five, the results indicated that the system col-lapses whit two SC, three delays are unacceptable and five is a reduction in service times near 75%. Becoming the recommended scenario
dc.language.isospaes_ES
dc.publisherCorporación Universidad de la Costa
dc.relation.ispartofseries1;
dc.sourceINGE CUCes_ES
dc.subjectSimulaciónes_ES
dc.subjectOperacioneses_ES
dc.subjectLogísticaes_ES
dc.titleAnálisis de la capacidad del proceso de cargue y descargue en la sociedad portuaria regional Barranquilla SPRBes_ES
dc.typeArticlees_ES
dcterms.references[1] W. David Kelton/Randall P. Sadowski/David T. Shurrock, Simulación con Software Arena®, Cuarta Edición. México: McGraw-Hill Interamericana.es_ES
dcterms.references[2] Rockwell Automation, Software Arena® 12. Estados Unidos, 2008.


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • Revistas Científicas
    Artículos de investigación publicados en revistas pertenecientes a la Editorial EDUCOSTA.

Show simple item record