Show simple item record

dc.creatorJimenez Barros, Miguel Angel
dc.creatorRamirez Rios, Diana Gineth
dc.creatorArdila Hernandez, Carlos Julio
dc.creatorCastro, Lauren
dc.creatorNeira Rodado, Dionicio
dc.date.accessioned2021-01-30T14:57:49Z
dc.date.available2021-01-30T14:57:49Z
dc.date.issued2020
dc.identifier.urihttps://hdl.handle.net/11323/7806
dc.description.abstractThe success of any project lies in a great manner on keeping costs in the estimated values, as well as meeting customer required due date. Therefore, there is a current need of developing an information system that facilitates the creation and managing of projects and their processes, including costing schemes, as well as monitoring an optimizing project’s makespan. In order to address this situation a user-friendly information system (IS) was developed. This IS includes an optimization module that reduces the project’s execution time, thus, minimizing costs and ultimately providing the manager with the right tools for the correct development of the project. Therefore, a better planning of activities in a reduced time is accomplished. In this way, the project manager is equipped with a decision support system (DSS) that allows a better decision making and, thanks to this performance optimization, a cost-effective solution can be delivered to the company. The optimization module is the main innovative component in this IS, considering that addresses the problem as a multiobjective one, considering at the same time makespan and cost. This module is based on global bacteria optimization (GBO). This becomes the most relevant improvement when compared to other ISs in the market.spa
dc.format.mimetypeapplication/pdfspa
dc.language.isoengspa
dc.publisherCorporación Universidad de la Costaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.sourceLecture Notes in Computer Sciencespa
dc.subjectInformation systemsspa
dc.subjectDSSspa
dc.subjectGBOspa
dc.subjectMultiobjective optimizationspa
dc.subjectEngineering projectsspa
dc.subjectProject managementspa
dc.titleDesign of a decision support system for multiobjective activity planning and programming using global bacteria optimizationspa
dc.typearticlespa
dcterms.references1. Katz, D., Kahn, R.L.: The Social Psychology of Organizations. Wiley, New York (1966). 838 p.spa
dcterms.references2. Kast, F.E., Rosenzweig, J.E.: Administración de las organizaciones, Madrid (1987)spa
dcterms.references3. Laudon, K., Laudon, J.: Sistemas de información gerencial, 12th edn. Pearson, Mexico (2011). 640 p.spa
dcterms.references4. Hansen, D., Mowen, M.: Administración de Costos: Contabilidad y Control, p. 31. Internacional Thomson Editores, Mexico (2003)spa
dcterms.references5. Horngren, C.T., Foster, G., Datar, S.M.: Contabilidad de Costos, un enfoque gerencial, p. 501. Prentice Hall, México (2007)spa
dcterms.references6. Alvarez-Valdés, R., Tamarit, J.M.: Heuristic algorithms for resource-constrained project scheduling: a review and empirical analysis. In: Slowinski, R., Weglarz, J. (eds.) Advances in Project Scheduling, pp. 113–134. Elsevier, Amsterdam (1989)spa
dcterms.references7. Bell, C.G., Han, J.: A new heuristic solution method in resource-constrained project scheduling. Naval Res. Logist. 38, 315–331 (1991)spa
dcterms.references8. Blazewicz, J., Lenstra, J.K., Rinnooy Kan, A.H.G.: Scheduling projects to resource constraints: classification and complexity. Discrete Appl. Math. 5, 11–24 (1983)spa
dcterms.references9. Dumond, J., Mabert, V.A.: Evaluating project scheduling and due date assignment procedures: an experimental analysis. Manage. Sci. 34, 101–118 (1988)spa
dcterms.references10. Elmaghraby, S.E., Herroelen, W.S.: The scheduling of activities to maximize the net present value of projects. Eur. J. Oper. Res. 49(1), 35–49 (1990)spa
dcterms.references11. Ballestín, F.G.: Nuevos metodos de resolucion del problema de secuenciacion de proyectos con recursos limitados. Doctorate dissertation, Universitat de Valencia, Servei Publicaciones, Valencia (2002)spa
dcterms.references12. Christofides, N., Alvarez-Valdés, R., Tamarit, J.M.: Project Scheduling with resource constraints: a branch and bound approach. Eur. J. Oper. Res. 29, 262–273 (1987)spa
dcterms.references13. Boctor, F.F.: Some efficient multi heuristic procedures for resource constrained project scheduling. Eur. J. Oper. Res. 49, 3–13 (1990)spa
dcterms.references14. Patterson, J.H.: A comparison of exact approaches for solving the multiple constrained resource. Manage. Sci. 30, 854–867 (1984)spa
dcterms.references15. Davis, E.W., Patterson, J.H.: A comparison heuristic and optimal solution in resource-constrained project scheduling. Manage. Sci. 21, 944–955 (1975)spa
dcterms.references16. Demeulemeester, E.: Minimizing resource availability cost in time-limited project networks. Manage. Sci. 41, 1590–1598 (1995)spa
dcterms.references17. Kolisch, R.: Efficient priority rules for the resource-constrained project scheduling problem. J. Oper. Manage. 14, 179–192 (1996)spa
dcterms.references18. Lee, J.K., Kim, Y.D.: Search heuristics for resource-constrained project scheduling. J. Oper. Res. Soc. 47, 678–689 (1996)spa
dcterms.references19. Leon, V.J., Ramamoorthy, B.: Strength and adaptability of problem space based neighbourhoods for resource-constrained scheduling. OR Spectr. 17, 173–182 (1995)spa
dcterms.references20. Patterson, J.H.: Project Scheduling: the effects of problem structure of heuristics. Naval Res. Logist. Q. 23, 95–123 (1976)spa
dcterms.references21. Patterson, J.H., Roth, G.W.: Scheduling a project under multiple resource constraints: a zero-one programming approach. AIIE Trans. 8, 449–455 (1976)spa
dcterms.references22. Sampsom, S.E., Weiss, E.N.: Local searches techniques for the generalized resource constrained project scheduling problem. Naval Res. Logist. 40, 665–675 (1993)spa
dcterms.references23. Mercado, D.R., Sepúlveda, J.A., Pedraza, L.E., Hernández, H.: Modelo de implementación de TIC en el sector transporte de la ciudad de Barranquilla utilizando dinámica de sistemas. Revista Dimensión Empresarial 12(1), 3645 (2014)spa
dcterms.references24. Microsoft, Project Software. https://products.office.com/es/Project/project-standard-desktop-software. Accessed on: May. 04, 2016spa
dcterms.references25. Logic Software, Easyprojects Software. https://www.easyprojects.net. Accessed 04 May 2016spa
dcterms.references26. Vertabase, Project Management Software. http://www.vertabase.com. Accessed 04 May 2016spa
dcterms.references27. Martínez Marín, S.J., Arango Aramburo, S., Robledo Velásquez, J.: El crecimiento de la industria del software en Colombia: Un análisis sistémico, Revista EIA, Edición 23, pp. 95–106 (2015)spa
dcterms.references28. Kendall, K.E., Kendall, J.E.: Análisis y diseño de sistemas, 6th edn. Pearson, Mexico (2005). 752 p.spa
dcterms.references29. Coronell, C., Morris, S.: Database Systems: Design, Implementation, and Management, 11th edn. Cengage Learning, Stamford (2015). 751 p.spa
dcterms.references30. Amaya Amaya, J.: istemas de información Gerenciales, 2nd edn. Ecoe Ediciones, Bogota (2010). 207 p.spa
dcterms.references31. Troelsen, A.: Pro C# 5.0 and the.NET 4.5 Framework, 6th edn. Apress, New York (2012)spa
dc.type.hasVersioninfo:eu-repo/semantics/publishedVersionspa
dc.source.urlhttps://link.springer.com/chapter/10.1007/978-3-030-47679-3_14spa
dc.rights.accessrightsinfo:eu-repo/semantics/openAccessspa
dc.identifier.doihttps://doi.org/10.1007/978-3-030-47679-3_14


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 International
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 International